Sign In | Join Free | My polstate.com |
|
Brand Name : ESTEL
Model Number : 336200918050002
Certification : ISO9001,CE,3C,FCC,TLC,IP55
Place of Origin : Place of Origin: Shenzhen,China (Mainland)
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, L/C,D/A, Western Union, Paypal, etc
Supply Ability : 8,000 sets per month
Delivery Time : 15-20 working days
Packaging Details : Wooden case
Material : Galvanized steel
Structure : 3 Compartments
Cooling System : AC220V air conditioners or DC48V fans
Alarm Sensors : Water sensor, Door sensor, Smoke sensor, Temperature sensor and Humidity sensor
Doors : With 3 front doors
Protection Level : IP55
Three Compartments Galvanized Steel Outdoor Base Station Including Mounting Rack
1. Cabinet Parameters
Type | Technical Parameters |
Dimension | External Dimension: W×D×H 2000×900×1800mm |
Layout | 3 compartments |
Equipment Installation Method | 19” rack and battery shelf |
Door | With 3 front doors . With anti-theft three point lock for outdoor cabinet (support padlock) |
Material | Galvanized steel; 1.5mm thick outer plate, 0.8mm thick inner plate |
Heat Insulation | There are heat insulation between inner wall and outer wall. The insulation material is 20mm PEF |
Structure | Welded or Assembled |
Ingress Protection | IP55 |
Cooling System | AC220V air conditioners and DC48V fans |
Lightning Proof | Grade B lightning proof,Nominal: 60KA, Max.: 100KA |
LED lamp | 48V LED lamps (immovable), with protective circuit breaker |
Temperature | Working Temperature: -40°C ~ +55°C |
Storage Temperature: -50°C ~ + 70°C | |
Transport Temperature: -50°C ~ +70°C | |
Relative Humidity | 5% ~ 100% |
Air Pressure | 62kpa ~ 101kpa (similar to 0m ~ 5000m altitude) |
Solar Radiation Intensity | 1120 ×(1±5%)W/m2 |
Mounting Type | Floor mounting type |
2. Cabinet Description
3. Cabinet Components Installation
3.1 LED lamp, smoke sensor and door sensor are installed at the top of the cabinet.
3.2 Air Conditioners are installed on the front doors of the cabinet.
3.3 There are cable inlets at the bottom of the cabinet.
3.4 There are mounting racks in side the cabinet.
4. Cabinet Quality Control Introduction
Our company resolutely implements the principle of quality first, we control and supervise the whole production process in strict accordance with the requirements of the ISO9001 system and the related implementation process. The quality department strictly controls all aspects like material inspection, production processes, product testing, shipment inspection and establishes traceable documents and product identification.
Our quality inspection team, is very familiar with the various standards, strict implementation of the standards required sampling and testing methods.
5.Cabinet Package
Wooden case with pallets
![]() |
Base Station Outdoor Rack Mount Enclosure Three Compartments With 3 Front Doors Images |